425 kWp, EPC Steel Peak, Ho Chi Minh
- System: 425 kWp
- Metal Deck
- PPA
- Est. 550 MWh/year
- CO₂ -320 tons/year
- Location
- Binh Loi Trung Ward, Ho Chi Minh City
- Industry Group
- Solar Energy Sector
- Capacity
- 425 kWp
- Savings Achieved
- 78%
Project Description
The 425 kWp rooftop solar project at Steel Peak Industrial Park, Ho Chi Minh City, is a turnkey solution under the PPA (Power Purchase Agreement) model, enabling the business to optimize electricity costs without any upfront investment. DNE Energy manages the entire process from site survey, engineering design, installation, to long-term operation and maintenance throughout the 25-year contract.
The system is installed on a metal deck roof with a total capacity of 425 kWp, utilizing Tier-1 international-standard solar panels. The estimated annual energy yield is 550 MWh, contributing to a CO₂ reduction of approximately 320 tons per year, supporting the company in meeting ESG standards and enhancing its sustainable development profile.